Fusion Bonded Epoxy Tank for Biogas Projects: A cost-effective vessel for all stages of anaerobic digestion

Ürün Ayrıntıları
Menşe yeri: Çin
Marka adı: CEC TANKS
Sertifika: ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model numarası: W201691123005
Ödeme ve Nakliye Şartları
Min sipariş miktarı: 1set
Fiyat: $5000~$20000 one set
Ambalaj bilgileri: Her iki çelik plaka arasındaki Pe poli-kanam; ahşap palet ve ahşap kutu
Teslim süresi: Depozito aldıktan 0-60 gün sonra
Ödeme koşulları: L/C, T/T
Yetenek temini: Ayda 60 set

Detay Bilgi

Menşe yeri Çin Marka adı CEC TANKS
Sertifika ISO 9001:2008, AWWA D103 , OSHA , BSCI Model numarası W201691123005
Çelik plakalar kalınlığı: 3mm ila 12mm, tank yapısına bağlıdır Korozyon bütünlüğü: Harika
Kimyasal direnç: Harika Kapasite: 20 m3 ila 18.000 m3
Hizmet ömrü: ≥30 yıl Geçirgenlik: Gaz / sıvı geçirimsiz
Vurgulamak:

Fusion bonded epoxy biogas tank

,

Anaerobic digestion epoxy tank

,

Cost-effective epoxy storage vessel

Ürün Tanımı

Fusion Bonded Epoxy Tank for Biogas Projects: A cost-effective vessel for all stages of anaerobic digestion

Biogas projects transform organic waste streams—such as manure, food waste, and industrial effluent—into renewable energy and nutrient-rich digestate. Anaerobic Digestion (AD) is a multi-stage process, requiring a variety of tanks for pre-treatment, primary digestion, and post-digestate storage. The capital investment for these large-volume vessels often dictates project feasibility. Therefore, selecting a cost-effective vessel for all stages of anaerobic digestion is crucial for maximizing return on investment and ensuring long-term operational viability. The Fusion Bonded Epoxy (FBE) Tank is the ideal solution, offering superior durability and a significantly lower lifecycle cost compared to traditional concrete or welded steel structures. At Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel), we engineer FBE bolted steel tanks to provide a secure, modular, and economically smart containment platform for every phase of the AD process.
 

Cost and Integrity Challenges in Anaerobic Digestion

For biogas projects, the containment solution must balance high performance with financial prudence across the entire project lifespan:

 
High Capital and Construction Costs: Traditional poured concrete and large welded steel tanks have substantial initial costs due to extensive on-site labor, long construction times, and specialized machinery. Delays in construction directly translate to lost revenue from biogas generation.

 

 
Corrosion in Primary Digesters: The most expensive stage, primary digestion, is where highly corrosive hydrogen sulfide (H2​S) is produced. H2​S forms sulfuric acid, which rapidly degrades standard linings, leading to premature structural failure and high maintenance expenses—the antithesis of a cost-effective vessel.

 

 
Need for Versatility and Modularity: Anaerobic digestion involves holding tanks, equalization basins, the main reactor, and post-treatment storage. A truly cost-effective solution must be easily scalable, modular, and adaptable to different configurations (CSTR, UASB, etc.) and volumes required for all stages.

 

 
Maintenance and Downtime: Concrete repair and relining of conventional steel tanks are complex, time-consuming, and require taking the facility offline, resulting in significant lost revenue. A durable, low-maintenance solution is essential for reducing the long-term operational budget.

 
The challenge is securing long-term structural integrity against corrosion and pressure while maintaining an advantageous project budget.
 

The FBE Solution: A Cost-Effective Vessel for All Stages

Center Enamel’s Fusion Bonded Epoxy Bolted Steel Tanks deliver a solution that is both high-performance and cost-effective for all stages of anaerobic digestion:

 
Lower Lifecycle Cost (LCC): The superior chemical resistance of the FBE coating against H2​S corrosion dramatically reduces the need for expensive maintenance, relining, and emergency repairs associated with concrete. The lower long-term operating cost ensures genuine cost-effectiveness.

 

 
Rapid, Predictable Construction: The modular, bolted design slashes on-site construction time by up to 60% compared to traditional construction. This speed minimizes labor costs, reduces project overhead, and allows the biogas projects to begin generating revenue sooner—a direct boost to profitability.

 

 
Versatility Across All Stages: FBE tanks are designed with a high degree of modularity, making them ideal for all required vessels: from low-pressure feedstock receiving tanks to high-pressure primary digesters and secondary storage. This standardized approach simplifies procurement, inventory, and engineering across the entire AD facility.

 

 
Exceptional Durability and Structural Integrity: Built from high-strength steel, FBE tanks are structurally superior, safely handling the immense weight of dense digestate and the internal pressures of a gas-tight system, ensuring decades of reliable service.

 

 
Inert and Optimized Process Environment: The non-leaching FBE coating is chemically inert, supporting the sensitive biology of AD and contributing to optimized biogas yield, ensuring the process operates at peak efficiency.

 
 

Product Industry Application: FBE Tanks in All Stages of Anaerobic Digestion

The FBE tank's versatility and structural integrity ensure its use as a cost-effective vessel throughout all stages of anaerobic digestion:

 
Stage 1: Feedstock Receiving/Equalization: Used to stabilize the incoming organic waste stream (slurry, POME, food waste) in terms of flow, temperature, and composition before it enters the main digester.

 

 
Stage 2: Primary Anaerobic Digestion (AD): Serves as the high-integrity, gas-tight main reactor vessel, resisting H2​S corrosion and providing the structure necessary to withstand internal pressure and heavy mixing equipment.

 

 
Stage 3: Secondary Digestion/Post-Digestate Storage: Employed to hold and stabilize the treated digestate (bioremainder) before dewatering, ensuring full utilization of residual nutrients and gas.

 

 
Ancillary Containment: Used for nutrient recovery systems, process water holding, and secured storage for separated sludge solids, providing a uniform, cost-effective containment solution across the site.

 
 

Project Case Studies: FBE Tanks in Biogas Projects

Center Enamel has a strong track record of providing reliable and cost-effective containment solutions for large-scale biogas projects, optimizing investment across various organic waste streams.

Project DescriptionProject Scale & Quantity
Guizhou Biogas ProjectA significant renewable energy initiative consisting of 2 units with a total capacity of 4,000 cubic meters, deployed as large-volume digester vessels in all stages of anaerobic digestion.
Hainan Haikou Biogas ProjectThis key infrastructure employed 4 units with a total capacity of 1,692 cubic meters, demonstrating cost-effective modularity for containing different process fluids across the biogas facility.
Jiangsu Taizhou Biogas Engineering ProjectWe supplied a high-performance system consisting of 3 units with a total capacity of 1,326 cubic meters, utilized for various stages of the AD process, from equalization to main digestion.

 

Center Enamel's Role in Optimizing Biogas Investment

Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) is a dedicated partner in the sustainable energy sector. Our FBE tanks for biogas projects are an investment in efficiency, safety, and longevity. We guarantee a solution that minimizes long-term operational expenditure by eliminating the pervasive threat of corrosion. By choosing Center Enamel, clients secure a cost-effective vessel for all stages of anaerobic digestion, ensuring a competitive advantage and a maximized return on their waste-to-energy infrastructure.
 

Conclusion: Maximizing ROI Through Durability

The complex and corrosive environment of anaerobic digestion demands a containment solution that delivers long-term performance without incurring excessive costs. The Fusion Bonded Epoxy Tank, with its superior corrosion resistance, rapid deployment, and structural reliability, is the definitive cost-effective vessel for all stages of anaerobic digestion. It provides biogas projects with the durable, low-maintenance, and versatile foundation necessary to efficiently convert organic waste into valuable resources, securing the project's profitability and environmental sustainability for its entire service life.
To deploy an optimized, high-performance containment solution that drastically reduces the lifecycle costs of your anaerobic digestion facility, choose Center Enamel's Fusion Bonded Epoxy Bolted Steel Tanks. Contact us today to secure the foundation of your biogas project.
 

 

Bu ürün hakkında daha fazla ayrıntı bilmek istiyorum
Lütfen soruşturma bilgilerinizi girin.
benzer ürünler
Shijiazhuang Zhengzhong Technology Co., Ltd
sales@cectank.com
86-20-34061629
Fuli Ticaret Merkezi odası 301#, Xingang West Rd.11#, Haizhu bölgesi, Guangzhou, Guangdong eyaleti, Çin.
MESAJ BIRAKIN
*E-posta
*İleti
Gönder
Çin İyi Kalite Çelik Tanklara Dökülen Cam Tedarikçi. Telif hakkı © 2016-2025 cectanks.com . Her hakkı saklıdır.
Mesaj Gönder